Elgin has the space and the climate for outdoor living nine months out of the year. Most backyards in this area are underused. A well-built deck, patio, or outdoor room adds real usable square footage to your home and changes how you use your property year-round.
We build complete outdoor spaces: the structural elements, the flatwork, the shade structures, and the built-in features that make it a room you actually use. We work from a design you choose, or we can help you figure out what fits your yard and your budget.

Pergolas, patio covers, and shade structures that make the space usable in the Texas heat.
Built-in grills, countertops, and prep areas. We handle the flatwork and structure; you outfit it how you want.
Paved or patio surround, seating walls, and in-ground or above-grade fire pits. Built to last.
Connecting indoor and outdoor elevations, stepped down to grade, with integrated seating or planters.
Defined zones for dining, seating, and grilling. Paved, decked, or a combination.
Block or stone walls that define the space and double as seating or garden beds.
Most outdoor living projects combine elements: a deck or patio as the base, a pergola or cover for shade, and one or two built-in features like a grill area or fire pit. We quote the full project so you know what you're committing to, and we can phase it if budget is a constraint.
All structural work is permitted through Bastrop County or the City of Elgin as required. If your project needs an engineered design, we coordinate that before breaking ground.
It depends on what you're building. A deck over 30 inches off the ground, any attached structure, or anything with a roof typically requires a permit in Bastrop County and the City of Elgin. Freestanding pergolas on the ground often do not. We determine what's required during the estimate and handle permitting as part of the project.
A pergola over an existing patio can be done in a day or two. A new deck takes one to two weeks. A full outdoor kitchen build with a new patio and shade structure can run two to four weeks. Permit review adds time before we can start. We give you a realistic schedule on the estimate.
Free written estimates. We come to you, walk the space, and give you real numbers before you commit to anything.